Power by county
Rusk, WI: data center power outlook
Rusk, Wisconsin is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Rusk carries 21 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Rusk spans 7 utilities, with BARRON ELECTRIC COOP, BAYFIELD ELECTRIC COOP, INC, CHIPPEWA VALLEY ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- BARRON ELECTRIC COOP, BAYFIELD ELECTRIC COOP, INC, CHIPPEWA VALLEY ELECTRIC COOP, JUMP RIVER ELECTRIC COOP INC, NORTH CENTRAL POWER CO INC, NORTHERN STATES POWER CO, PRICE ELECTRIC COOP INC
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 21
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 7 serving utilities: 8.2 to 9.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 417 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 3.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 12,081 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Rusk
What follows is a screening-grade read of Rusk, Wisconsin, built only from named public datasets. Grid access in Rusk extends to 345 kV, a high-voltage line class. The mapped layer packs 21 substations into Rusk, a dense spread of options.
Interconnection over Rusk runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Rusk, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Rusk that report an industrial rate span 3 of 7 serving utilities: 8.2 to 9.6¢/kWh, shown as context and never as the county rate.
The queue feeds show 1 project for Rusk, totalling 416.5 MW of requested capacity. Rusk, Wisconsin has no EIA-860M generation on file, which reads as zero rather than as a gap. Rusk sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Rusk withdrew 3.34 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 12,081 people are employed in construction within a 120 km commute of Rusk (BLS QCEW), which frames staffing distance rather than free labour.
For Rusk, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Rusk, Wisconsin describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Rusk, Wisconsin, a specific address needs its own interconnection study, which this page does not attempt. The figures for Rusk, Wisconsin refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.