Power by county
Rock, WI: data center power outlook
Rock sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Rock, Wisconsin, drawn from public datasets. Counting from the mapped infrastructure, Rock holds 78 mapped substations and reaches 345 kV. Rock is covered by 8 retail service territories, including BRODHEAD WATER & LIGHTING COMM, CITY OF EVANSVILLE, COMMONWEALTH EDISON CO.
Grid position at a glance
- Serving utilities
- BRODHEAD WATER & LIGHTING COMM, CITY OF EVANSVILLE, COMMONWEALTH EDISON CO, ROCK ENERGY COOPERATIVE, SCENIC RIVERS ENERGY COOP, WISCONSIN ELECTRIC POWER CO, WISCONSIN POWER & LIGHT CO, WPPI ENERGY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 78
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 of 8 serving utilities: 5.5 to 12.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 14 projects, 1,368 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 29 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 126,259 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Rock
Below, Rock in Wisconsin is described from public data as a starting point for siting diligence. Rock reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 78 substations mapped, Rock offers interconnection points across many locations.
Rock falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Rock is the 8.9 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Rock, reported per-utility industrial rates cover 6 of 8 serving utilities: 5.5 to 12.1¢/kWh, offered only as context beneath the state figure.
Rock has 14 interconnection-queue projects on record, totalling 1,368.06 MW of requested capacity. EIA-860M lists nothing planned or under construction for Rock, Wisconsin, which is a national filing and so a real zero. The balancing authority covering Rock carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Rock are 29.33 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Rock, some 126,259 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Rock are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Rock, Wisconsin together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Rock, Wisconsin is an address-level interconnection study; the county figures here only narrow where to look. For Rock, Wisconsin, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.