Power by county
Richland, WI: data center power outlook
Richland, Wisconsin is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Richland carries 13 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Richland spans 8 utilities, with CITY OF RICHLAND CENTER - (WI), NORTHERN STATES POWER CO, RICHLAND ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF RICHLAND CENTER - (WI), NORTHERN STATES POWER CO, RICHLAND ELECTRIC COOP, SCENIC RIVERS ENERGY COOP, VERNON ELECTRIC COOP, VILLAGE OF VIOLA - (WI), WISCONSIN POWER & LIGHT CO, WPPI ENERGY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 161 kV
- Substations in county
- 13
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 8 serving utilities: 8.3 to 12.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 50 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 4.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 35,434 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Richland
The material below frames Richland, Wisconsin for a prospective large load, drawing only on public sources. At 161 kV, Richland sits in the transmission class that a large load would look to. The mapped layer places 13 substations across Richland, a moderate density.
Interconnection over Richland runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Richland, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Richland that report an industrial rate span 4 of 8 serving utilities: 8.3 to 12.1¢/kWh, shown as context and never as the county rate.
The queue feeds show 1 project for Richland, totalling 49.98 MW of requested capacity. EIA-860M lists nothing planned or under construction for Richland, Wisconsin, which is a national filing and so a real zero. Richland sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Richland withdrew 4.41 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 35,434 people are employed in construction within a 120 km commute of Richland (BLS QCEW), which frames staffing distance rather than free labour.
For Richland, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Richland, Wisconsin describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Richland, Wisconsin, a specific address needs its own interconnection study, which this page does not attempt. The figures for Richland, Wisconsin refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.