Power by county

Marquette, WI: data center power outlook

Marquette, Wisconsin is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Marquette carries 14 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Marquette spans 5 utilities, with ADAMS-COLUMBIA ELECTRIC COOP, PIONEER POWER AND LIGHT CO, WESTFIELD ELECTRIC COMPANY among those mapped.

Grid position at a glance

Serving utilities
ADAMS-COLUMBIA ELECTRIC COOP, PIONEER POWER AND LIGHT CO, WESTFIELD ELECTRIC COMPANY, WISCONSIN POWER & LIGHT CO, WPPI ENERGY
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
138 kV
Substations in county
14
Industrial retail rate
8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 8.9 to 17.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
9.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
59,139 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Marquette

What follows is a screening-grade read of Marquette, Wisconsin, built only from named public datasets. At 138 kV, Marquette sits in the transmission class that a large load would look to. The mapped layer places 14 substations across Marquette, a moderate density.

Interconnection over Marquette runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Marquette, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Marquette that report an industrial rate span 4 of 5 serving utilities: 8.9 to 17.3¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Marquette, Wisconsin, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Marquette, Wisconsin, which is a national filing and so a real zero. Marquette sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Marquette withdrew 9.8 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 59,139 people are employed in construction within a 120 km commute of Marquette (BLS QCEW), which frames staffing distance rather than free labour.

For Marquette, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Marquette, Wisconsin describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Marquette, Wisconsin, a specific address needs its own interconnection study, which this page does not attempt. The figures for Marquette, Wisconsin refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources