Power by county
Calumet, WI: data center power outlook
Calumet, Wisconsin is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Calumet carries 17 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Calumet spans 7 utilities, with CITY OF KAUKAUNA, CITY OF KIEL - (WI), CITY OF MENASHA - (WI) among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF KAUKAUNA, CITY OF KIEL - (WI), CITY OF MENASHA - (WI), CITY OF NEW HOLSTEIN - (WI), WISCONSIN ELECTRIC POWER CO, WISCONSIN PUBLIC SERVICE CORP, WPPI ENERGY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 17
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 7 serving utilities: 7.0 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 950 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 16 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 79,032 employed in construction within ~120 km (21 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Calumet
What follows is a screening-grade read of Calumet, Wisconsin, built only from named public datasets. Grid access in Calumet extends to 345 kV, a high-voltage line class. The mapped layer places 17 substations across Calumet, a moderate density.
Interconnection over Calumet runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Calumet, the rate shown is the state industrial average of 8.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Calumet that report an industrial rate span 4 of 7 serving utilities: 7.0 to 9.3¢/kWh, shown as context and never as the county rate.
The queue feeds show 3 projects for Calumet, totalling 950 MW of requested capacity. EIA-860M lists nothing planned or under construction for Calumet, Wisconsin, which is a national filing and so a real zero. Calumet sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Calumet withdrew 16.38 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 79,032 people are employed in construction within a 120 km commute of Calumet (BLS QCEW), which frames staffing distance rather than free labour.
For Calumet, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Calumet, Wisconsin describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Calumet, Wisconsin, a specific address needs its own interconnection study, which this page does not attempt. The figures for Calumet, Wisconsin refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.