Power by county
Skagit, WA: data center power outlook
Skagit, Washington is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Skagit carries 43 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Skagit spans 6 utilities, with BONNEVILLE POWER ADMINISTRATION, OKANOGAN COUNTY ELEC COOP, INC, PUD 1 OF SNOHOMISH COUNTY among those mapped.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, OKANOGAN COUNTY ELEC COOP, INC, PUD 1 OF SNOHOMISH COUNTY, PUD NO 1 OF CHELAN COUNTY, PUD NO 1 OF WHATCOM COUNTY, PUGET SOUND ENERGY INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 43
- Industrial retail rate
- 6.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 1.3 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 642 lb CO2/MWh
- Water withdrawals
- 43 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 119,227 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Skagit
The material below frames Skagit, Washington for a prospective large load, drawing only on public sources. Grid access in Skagit extends to 500 kV, a high-voltage line class. The mapped layer packs 43 substations into Skagit, a dense spread of options.
Because Skagit, Washington sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Skagit, the rate shown is the state industrial average of 6.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Skagit that report an industrial rate span 5 of 6 serving utilities: 1.3 to 7.6¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Skagit, Washington in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Skagit, Washington in EIA-860M as planned or under construction, which counts as a measured zero. Skagit sits under a balancing authority that eGRID puts at 641.69 lb CO2 per MWh.
Skagit withdrew 43.07 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 119,227 people are employed in construction within a 120 km commute of Skagit (BLS QCEW), which frames staffing distance rather than free labour.
For Skagit, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Skagit, Washington describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Skagit, Washington, a specific address needs its own interconnection study, which this page does not attempt. The figures for Skagit, Washington refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.