Power by county
San Juan, WA: data center power outlook
San Juan sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for San Juan, Washington, drawn from public datasets. Counting from the mapped infrastructure, San Juan holds 27 mapped substations and reaches 115 kV. San Juan is covered by 2 retail service territories, including BONNEVILLE POWER ADMINISTRATION, ORCAS POWER & LIGHT COOP.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, ORCAS POWER & LIGHT COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 27
- Industrial retail rate
- 6.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 2 serving utilities: 1.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 212 lb CO2/MWh
- Water withdrawals
- 2.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 45,862 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in San Juan
Everything here about San Juan, Washington comes from public federal and state records, with the gaps left visible. San Juan reaches 115 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 27 substations mapped, San Juan offers interconnection points across many locations.
San Juan, Washington is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for San Juan is the 6.9 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across San Juan, reported per-utility industrial rates cover 1 of 2 serving utilities: 1.3¢/kWh, offered only as context beneath the state figure.
Across the covered feeds, San Juan, Washington carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for San Juan, Washington in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering San Juan carries a grid carbon intensity of 212.458 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in San Juan are 2.72 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around San Juan, some 45,862 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for San Juan are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for San Juan, Washington together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for San Juan, Washington is an address-level interconnection study; the county figures here only narrow where to look. For San Juan, Washington, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.