The grid around Lincoln, Washington is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Lincoln the mapped layer shows 36 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Lincoln is split among 7 utilities, among them AVISTA CORP, BIG BEND ELECTRIC COOP, INC, BONNEVILLE POWER ADMINISTRATION.
Grid position at a glance
- Serving utilities
- AVISTA CORP, BIG BEND ELECTRIC COOP, INC, BONNEVILLE POWER ADMINISTRATION, INLAND POWER & LIGHT COMPANY, NESPELEM VALLEY ELEC COOP, INC, PUD NO 1 OF FERRY COUNTY, PUD NO 2 OF GRANT COUNTY
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 36
- Industrial retail rate
- 6.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 1.3 to 7.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 359 lb CO2/MWh
- Water withdrawals
- 19 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 18,675 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lincoln
Read on for the public power picture of Lincoln in Washington, assembled for data center siting. At 500 kV, Lincoln carries high-voltage transmission at its strongest mapped point. Lincoln contains 36 mapped substations, a dense footprint that spreads interconnection options across many points.
Lincoln, Washington lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Lincoln carries the state industrial average retail rate of 6.9 cents per kWh from EIA-861, applied statewide. For Lincoln, the per-utility spread is 5 of 7 serving utilities: 1.3 to 7.8¢/kWh, which qualifies but never replaces the state average.
Lincoln, Washington shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Lincoln, Washington, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Lincoln shows 358.777 lb CO2 per MWh.
For Lincoln, the USGS 2015 compilation records 18.59 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Lincoln sits within commuting range of roughly 18,675 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Lincoln here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Lincoln, Washington settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Lincoln, Washington requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Lincoln, Washington are logged directly below, so each figure on this page can be traced back to its public dataset.