Power by county
Waynesboro, VA: data center power outlook
Waynesboro, Virginia is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Waynesboro carries 3 mapped substations within its boundary, and the highest reachable grid access is 115 kV. The serving utility mapped across Waynesboro is VIRGINIA ELECTRIC & POWER CO.
Grid position at a glance
- Serving utilities
- VIRGINIA ELECTRIC & POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 115 kV
- Substations in county
- 3
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 serving utility: 6.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 2.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 33,687 employed in construction within ~120 km (40 of 44 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Waynesboro
What follows is a screening-grade read of Waynesboro, Virginia, built only from named public datasets. At 115 kV, Waynesboro sits in the transmission class that a large load would look to. The mapped footprint in Waynesboro, Virginia is sparse, 3 substations, so options cluster at those points.
Interconnection over Waynesboro runs through the PJM market (PJM Interconnection) and its rules. For Waynesboro, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Waynesboro that report an industrial rate span 1 serving utility: 6.0¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Waynesboro, Virginia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Waynesboro, Virginia in EIA-860M as planned or under construction, which counts as a measured zero. Waynesboro sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Waynesboro withdrew 2.47 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 33,687 people are employed in construction within a 120 km commute of Waynesboro (BLS QCEW), which frames staffing distance rather than free labour.
For Waynesboro, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Waynesboro, Virginia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Waynesboro, Virginia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Waynesboro, Virginia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.