Power by county

Pulaski, VA: data center power outlook

For Pulaski, Virginia, the public grid picture begins with its place in the PJM market (PJM Interconnection) and the infrastructure mapped inside the county. Grid access across Pulaski tops out at 765 kV, over a footprint of 16 mapped substations. In Pulaski, 3 utilities share the retail territory, among them APPALACHIAN POWER CO, CITY OF RADFORD - (VA), CRAIG-BOTETOURT ELECTRIC COOP.

Grid position at a glance

Serving utilities
APPALACHIAN POWER CO, CITY OF RADFORD - (VA), CRAIG-BOTETOURT ELECTRIC COOP
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
16
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 3 serving utilities: 9.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
150 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
5.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
34,443 employed in construction within ~120 km (31 of 41 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Pulaski

For Pulaski, Virginia, the following sections turn public grid records into a siting-oriented summary. The highest mapped voltage in Pulaski is 765 kV, an extra-high-voltage line. Pulaski carries 16 substations in the mapped layer, spread across the county.

For Pulaski, the PJM market (PJM Interconnection) is the operator that handles interconnection and capacity. The state industrial average retail rate is 9.4 cents per kWh, drawn from EIA-861 and applied to Pulaski at the state level rather than as a county rate. The serving utilities in Pulaski that publish a rate range 1 of 3 serving utilities: 9.9¢/kWh, a spread kept separate from the state average.

For Pulaski, Virginia, no queued project appears in the feeds currently covered. Federal filings (EIA-860M) list 150 MW of generation as planned or under construction in Pulaski. Grid carbon intensity for Pulaski, via its balancing authority, is 716.09 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Pulaski at 5.56 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Pulaski, about 34,443 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Pulaski figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Pulaski, Virginia qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Pulaski, Virginia turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Pulaski, Virginia traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.

Sources