Power by county
Isle of Wight, VA: data center power outlook
Isle of Wight sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Isle of Wight, Virginia, drawn from public datasets. Counting from the mapped infrastructure, Isle of Wight holds 5 mapped substations and reaches 500 kV. Isle of Wight is covered by 4 retail service territories, including CITY OF FRANKLIN - (VA), COMMUNITY ELECTRIC COOP, PRINCE GEORGE ELECTRIC COOP.
Grid position at a glance
- Serving utilities
- CITY OF FRANKLIN - (VA), COMMUNITY ELECTRIC COOP, PRINCE GEORGE ELECTRIC COOP, VIRGINIA ELECTRIC & POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 500 kV
- Substations in county
- 5
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 4 serving utilities: 6.0 to 9.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 258 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 17 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 74,468 employed in construction within ~120 km (46 of 50 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Isle of Wight
Below, Isle of Wight in Virginia is described from public data as a starting point for siting diligence. Isle of Wight reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. Only 5 substations is mapped in Isle of Wight, Virginia, keeping interconnection points few.
Isle of Wight falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Isle of Wight is the 9.4 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Isle of Wight, reported per-utility industrial rates cover 2 of 4 serving utilities: 6.0 to 9.9¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Isle of Wight, Virginia, which may be quiet or simply uningested. Isle of Wight has 258.4 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Isle of Wight carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Isle of Wight are 17.18 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Isle of Wight, some 74,468 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Isle of Wight are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Isle of Wight, Virginia together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Isle of Wight, Virginia is an address-level interconnection study; the county figures here only narrow where to look. For Isle of Wight, Virginia, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.