Power by county

Windham, VT: data center power outlook

Windham sits in the ISONE market (ISO New England); what follows is the screening-grade grid picture for Windham, Vermont, drawn from public datasets. Counting from the mapped infrastructure, Windham holds 28 mapped substations and reaches 345 kV. Windham is covered by 7 retail service territories, including GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, MASSACHUSETTS ELECTRIC CO.

Grid position at a glance

Serving utilities
GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, MASSACHUSETTS ELECTRIC CO, NEW HAMPSHIRE ELEC COOP INC, NSTAR ELECTRIC COMPANY, PUBLIC SERVICE CO OF NH, VILLAGE OF JACKSONVILLE - (VT)
ISO / market
ISONE (ISO New England)
Highest grid access
345 kV
Substations in county
28
Industrial retail rate
12.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 7 serving utilities: 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
541 lb CO2/MWh
Water withdrawals
4.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
79,289 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Windham

Below, Windham in Vermont is described from public data as a starting point for siting diligence. Windham reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 28 substations mapped, Windham offers interconnection points across many locations.

Windham falls inside the ISONE market (ISO New England), which governs how its interconnection requests and capacity move. The rate for Windham is the 12.4 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Windham, reported per-utility industrial rates cover 1 of 7 serving utilities: 10.8¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Windham, Vermont, which may be quiet or simply uningested. Windham, Vermont has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Windham carries a grid carbon intensity of 541.365 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Windham are 4.4 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Windham, some 79,289 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Windham are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Windham, Vermont together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Windham, Vermont is an address-level interconnection study; the county figures here only narrow where to look. For Windham, Vermont, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources