Washington, VT: data center power outlook
Washington, Vermont is served through the ISONE market (ISO New England), and the figures below describe the public grid around a prospective data center site there. Washington carries 34 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Washington spans 4 utilities, with GREEN MOUNTAIN POWER CORP, VERMONT ELECTRIC COOPERATIVE, INC, VILLAGE OF NORTHFIELD - (VT) among those mapped.
Grid position at a glance
- Serving utilities
- GREEN MOUNTAIN POWER CORP, VERMONT ELECTRIC COOPERATIVE, INC, VILLAGE OF NORTHFIELD - (VT), WASHINGTON ELECTRIC COOP - (VT)
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 115 kV
- Substations in county
- 34
- Industrial retail rate
- 12.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 4 serving utilities: 10.8 to 12.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 4.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 22,195 employed in construction within ~120 km (18 of 19 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Washington
The material below frames Washington, Vermont for a prospective large load, drawing only on public sources. At 115 kV, Washington sits in the transmission class that a large load would look to. The mapped layer packs 34 substations into Washington, a dense spread of options.
Interconnection over Washington runs through the ISONE market (ISO New England) and its rules. For Washington, the rate shown is the state industrial average of 12.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Washington that report an industrial rate span 2 of 4 serving utilities: 10.8 to 12.9¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Washington, Vermont in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Washington, Vermont, which is a national filing and so a real zero. Washington sits under a balancing authority that eGRID puts at 541.365 lb CO2 per MWh.
Washington withdrew 4.31 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 22,195 people are employed in construction within a 120 km commute of Washington (BLS QCEW), which frames staffing distance rather than free labour.
For Washington, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Washington, Vermont describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Washington, Vermont, a specific address needs its own interconnection study, which this page does not attempt. The figures for Washington, Vermont refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.