Power by county

Wise, TX: data center power outlook

Wise, Texas is served through the ERCOT market (Electric Reliability Council of Texas), and the figures below describe the public grid around a prospective data center site there. Wise carries 36 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Wise spans 11 utilities, with CITY OF BRIDGEPORT - (TX), COOKE COUNTY ELEC COOP ASSN, DENTON COUNTY ELEC COOP, INC among those mapped.

Grid position at a glance

Serving utilities
CITY OF BRIDGEPORT - (TX), COOKE COUNTY ELEC COOP ASSN, DENTON COUNTY ELEC COOP, INC, FORT BELKNAP ELECTRIC COOP INC, GRAYSON-COLLIN ELEC COOP, INC, J-A-C ELECTRIC COOP INC, ONCOR ELECTRIC DELIVERY COMPANY LLC, TEXAS-NEW MEXICO POWER CO, TRI-COUNTY ELECTRIC COOP, INC (TX), UNITED ELECTRIC COOP SERVICE INC - (TX), WISE ELECTRIC COOP INC
ISO / market
ERCOT (Electric Reliability Council of Texas)
Highest grid access
345 kV
Substations in county
36
Industrial retail rate
6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 11 serving utilities: 7.9 to 14.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
11 projects, 3,974 MW
Proposed generation
403 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
734 lb CO2/MWh
Water withdrawals
12 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
229,886 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Wise

The material below frames Wise, Texas for a prospective large load, drawing only on public sources. Grid access in Wise extends to 345 kV, a high-voltage line class. The mapped layer packs 36 substations into Wise, a dense spread of options.

Interconnection over Wise runs through the ERCOT market (Electric Reliability Council of Texas) and its rules. For Wise, the rate shown is the state industrial average of 6.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Wise that report an industrial rate span 4 of 11 serving utilities: 7.9 to 14.0¢/kWh, shown as context and never as the county rate.

The queue feeds show 11 projects for Wise, totalling 3,973.67 MW of requested capacity. EIA-860M records 402.8 MW planned or under construction for Wise. Wise sits under a balancing authority that eGRID puts at 734.003 lb CO2 per MWh.

Wise withdrew 12.17 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 229,886 people are employed in construction within a 120 km commute of Wise (BLS QCEW), which frames staffing distance rather than free labour.

For Wise, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Wise, Texas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Wise, Texas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Wise, Texas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.