Power by county
Real, TX: data center power outlook
Real sits in the ERCOT market (Electric Reliability Council of Texas); what follows is the screening-grade grid picture for Real, Texas, drawn from public datasets. Counting from the mapped infrastructure, Real holds 2 mapped substations and reaches 69 kV. Real is covered by 8 retail service territories, including AEP TEXAS CENTRAL COMPANY, AEP TEXAS NORTH COMPANY, BANDERA ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- AEP TEXAS CENTRAL COMPANY, AEP TEXAS NORTH COMPANY, BANDERA ELECTRIC COOP, INC, CENTRAL TEXAS ELEC COOP, INC, MEDINA ELECTRIC COOP, INC, PEDERNALES ELECTRIC COOP, INC, RIO GRANDE ELECTRIC COOP, INC, SOUTHWEST TEXAS ELEC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 69 kV
- Substations in county
- 2
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 of 8 serving utilities: 6.4 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 10 MW
- Proposed generation
- 10 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 0.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 8,222 employed in construction within ~120 km (12 of 15 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Real
Everything here about Real, Texas comes from public federal and state records, with the gaps left visible. The highest mapped voltage in Real is 69 kV, a sub-transmission class that usually serves distribution rather than a single large load. The mapped footprint in Real, Texas is sparse, 2 substations, so options cluster at those points.
Real falls inside the ERCOT market (Electric Reliability Council of Texas), which governs how its interconnection requests and capacity move. The rate for Real is the 6.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Real, reported per-utility industrial rates cover 6 of 8 serving utilities: 6.4 to 10.2¢/kWh, offered only as context beneath the state figure.
Real has 1 interconnection-queue project on record, totalling 9.9 MW of requested capacity. Real has 9.9 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Real carries a grid carbon intensity of 734.003 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Real are 0.74 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Real, some 8,222 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Real are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Real, Texas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Real, Texas is an address-level interconnection study; the county figures here only narrow where to look. For Real, Texas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.