Sumner, TN: data center power outlook
The grid around Sumner, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Sumner the mapped layer shows 35 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Sumner is split among 6 utilities, among them CITY OF GALLATIN - (TN), CUMBERLAND ELEC MEMBER CORP, MIDDLE TENNESSEE E M C.
Grid position at a glance
- Serving utilities
- CITY OF GALLATIN - (TN), CUMBERLAND ELEC MEMBER CORP, MIDDLE TENNESSEE E M C, NASHVILLE ELECTRIC SERVICE, TRI-COUNTY ELEC MEMBER CORP (TN), WARREN RURAL ELEC COOP CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 35
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 5.7 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 387 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 78,600 employed in construction within ~120 km (36 of 43 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sumner
Read on for the public power picture of Sumner in Tennessee, assembled for data center siting. At 500 kV, Sumner carries high-voltage transmission at its strongest mapped point. Sumner contains 35 mapped substations, a dense footprint that spreads interconnection options across many points.
No organized wholesale market covers Sumner, Tennessee, so capacity moves through the local utility and bilateral agreements. Sumner carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Sumner, the per-utility spread is 5 of 6 serving utilities: 5.7 to 7.6¢/kWh, which qualifies but never replaces the state average.
Sumner, Tennessee has nothing in the interconnection queue across the feeds covered here, quiet or uningested. No generation is filed as planned or under construction in Sumner, Tennessee in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Sumner shows 641.018 lb CO2 per MWh.
For Sumner, the USGS 2015 compilation records 386.63 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Sumner sits within commuting range of roughly 78,600 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Sumner here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Sumner, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Sumner, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Sumner, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.