Power by county
Polk, TN: data center power outlook
Polk, Tennessee is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Polk carries 9 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Polk spans 6 utilities, with BLUE RIDGE MOUNTAIN EMC - (GA), DUKE ENERGY CAROLINAS, LLC, FORT LOUDOUN ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- BLUE RIDGE MOUNTAIN EMC - (GA), DUKE ENERGY CAROLINAS, LLC, FORT LOUDOUN ELECTRIC COOP, NORTH GEORGIA ELEC MEMBER CORP, TRI-STATE ELECTRIC MEMBER CORP, VOLUNTEER ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 161 kV
- Substations in county
- 9
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 6 serving utilities: 6.0 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 2.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 74,257 employed in construction within ~120 km (44 of 47 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Polk
The material below frames Polk, Tennessee for a prospective large load, drawing only on public sources. At 161 kV, Polk sits in the transmission class that a large load would look to. The mapped layer places 9 substations across Polk, a moderate density.
Polk, Tennessee is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Polk, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Polk that report an industrial rate span 2 of 6 serving utilities: 6.0 to 8.0¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Polk, Tennessee carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Polk, Tennessee, which is a national filing and so a real zero. Polk sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.
Polk withdrew 2.1 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 74,257 people are employed in construction within a 120 km commute of Polk (BLS QCEW), which frames staffing distance rather than free labour.
For Polk, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Polk, Tennessee describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Polk, Tennessee, a specific address needs its own interconnection study, which this page does not attempt. The figures for Polk, Tennessee refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.