Humphreys, Tennessee is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Humphreys carries 20 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Humphreys spans 3 utilities, with BENTON COUNTY, CITY OF DICKSON, MERIWETHER LEWIS ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- BENTON COUNTY, CITY OF DICKSON, MERIWETHER LEWIS ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 20
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 serving utilities: 5.9 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 365 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 62,562 employed in construction within ~120 km (34 of 35 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Humphreys
What follows is a screening-grade read of Humphreys, Tennessee, built only from named public datasets. Grid access in Humphreys extends to 500 kV, a high-voltage line class. The mapped layer places 20 substations across Humphreys, a moderate density.
Humphreys, Tennessee is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Humphreys, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Humphreys that report an industrial rate span 3 serving utilities: 5.9 to 9.8¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Humphreys, Tennessee in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Humphreys, Tennessee, which is a national filing and so a real zero. Humphreys sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.
Humphreys withdrew 365.16 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 62,562 people are employed in construction within a 120 km commute of Humphreys (BLS QCEW), which frames staffing distance rather than free labour.
For Humphreys, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Humphreys, Tennessee describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Humphreys, Tennessee, a specific address needs its own interconnection study, which this page does not attempt. The figures for Humphreys, Tennessee refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.