Henderson, TN: data center power outlook

The grid around Henderson, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Henderson the mapped layer shows 10 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Henderson is split among 5 utilities, among them CARROLL COUNTY - (TN), CITY OF LEXINGTON - (TN), CITY OF MILAN.

Grid position at a glance

Serving utilities
CARROLL COUNTY - (TN), CITY OF LEXINGTON - (TN), CITY OF MILAN, PICKWICK ELECTRIC COOP, SOUTHWEST TENNESSEE E M C
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
10
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 5.2 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
641 lb CO2/MWh
Water withdrawals
0.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
22,404 employed in construction within ~120 km (34 of 36 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Henderson

Read on for the public power picture of Henderson in Tennessee, assembled for data center siting. At 500 kV, Henderson carries high-voltage transmission at its strongest mapped point. Henderson contains 10 mapped substations, a moderate footprint spread across the service area.

No organized wholesale market covers Henderson, Tennessee, so capacity moves through the local utility and bilateral agreements. Henderson carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Henderson, the per-utility spread is 5 serving utilities: 5.2 to 9.3¢/kWh, which qualifies but never replaces the state average.

Henderson, Tennessee shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Henderson, Tennessee, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Henderson shows 641.018 lb CO2 per MWh.

For Henderson, the USGS 2015 compilation records 0.56 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Henderson sits within commuting range of roughly 22,404 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Henderson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Henderson, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Henderson, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Henderson, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.