Power by county
Fentress, TN: data center power outlook
Fentress, Tennessee is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Fentress carries 2 mapped substations within its boundary, and the highest reachable grid access is 161 kV. Service in Fentress spans 2 utilities, with PLATEAU ELECTRIC COOPERATIVE, VOLUNTEER ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- PLATEAU ELECTRIC COOPERATIVE, VOLUNTEER ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 161 kV
- Substations in county
- 2
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 serving utilities: 5.1 to 6.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 2.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 30,444 employed in construction within ~120 km (35 of 46 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Fentress
What follows is a screening-grade read of Fentress, Tennessee, built only from named public datasets. At 161 kV, Fentress sits in the transmission class that a large load would look to. Fentress, Tennessee carries a thin 2-substation footprint in the mapped layer, concentrating where a connection could land.
Sitting outside any organized market, Fentress, Tennessee handles interconnection through its utility rather than a central operator. For Fentress, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Fentress that report an industrial rate span 2 serving utilities: 5.1 to 6.0¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Fentress, Tennessee, which may be quiet or simply uningested. Nothing is on file for Fentress, Tennessee in EIA-860M as planned or under construction, which counts as a measured zero. Fentress sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.
Fentress withdrew 2.12 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 30,444 people are employed in construction within a 120 km commute of Fentress (BLS QCEW), which frames staffing distance rather than free labour.
For Fentress, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Fentress, Tennessee describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Fentress, Tennessee, a specific address needs its own interconnection study, which this page does not attempt. The figures for Fentress, Tennessee refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.