The grid around Bradley, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Bradley the mapped layer shows 45 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Bradley is split among 5 utilities, among them CITY OF CHATTANOOGA - (TN), CITY OF CLEVELAND - (TN), GEORGIA POWER CO.
Grid position at a glance
- Serving utilities
- CITY OF CHATTANOOGA - (TN), CITY OF CLEVELAND - (TN), GEORGIA POWER CO, NORTH GEORGIA ELEC MEMBER CORP, VOLUNTEER ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 45
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 6.0 to 7.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 19 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 46,162 employed in construction within ~120 km (43 of 46 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bradley
Read on for the public power picture of Bradley in Tennessee, assembled for data center siting. At 500 kV, Bradley carries high-voltage transmission at its strongest mapped point. Bradley contains 45 mapped substations, a dense footprint that spreads interconnection options across many points.
There is no organized wholesale market over Bradley, Tennessee; arrangements run through the serving utility instead. Bradley carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Bradley, the per-utility spread is 3 of 5 serving utilities: 6.0 to 7.1¢/kWh, which qualifies but never replaces the state average.
Bradley, Tennessee has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Bradley, Tennessee, a real zero rather than a gap. In eGRID, the balancing authority over Bradley shows 641.018 lb CO2 per MWh.
For Bradley, the USGS 2015 compilation records 19.36 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Bradley sits within commuting range of roughly 46,162 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Bradley here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Bradley, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Bradley, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Bradley, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.