Bedford, TN: data center power outlook
Bedford sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Bedford, Tennessee, drawn from public datasets. Counting from the mapped infrastructure, Bedford holds 13 mapped substations and reaches 500 kV. Bedford is covered by 4 retail service territories, including CITY OF FAYETTEVILLE, CITY OF SHELBYVILLE - (TN), DUCK RIVER ELEC MEMBER CORP.
Grid position at a glance
- Serving utilities
- CITY OF FAYETTEVILLE, CITY OF SHELBYVILLE - (TN), DUCK RIVER ELEC MEMBER CORP, MIDDLE TENNESSEE E M C
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 13
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 serving utilities: 6.5 to 7.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 7.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 84,797 employed in construction within ~120 km (35 of 38 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bedford
Everything here about Bedford, Tennessee comes from public federal and state records, with the gaps left visible. Bedford reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 13 substations mapped, Bedford has a moderate spread of interconnection points.
Sitting outside any organized market, Bedford, Tennessee handles interconnection through its utility rather than a central operator. The rate for Bedford is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Bedford, reported per-utility industrial rates cover 4 serving utilities: 6.5 to 7.2¢/kWh, offered only as context beneath the state figure.
Across the covered feeds, Bedford, Tennessee carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Bedford, Tennessee in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Bedford carries a grid carbon intensity of 641.018 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Bedford are 7.18 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Bedford, some 84,797 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Bedford are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Bedford, Tennessee together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Bedford, Tennessee is an address-level interconnection study; the county figures here only narrow where to look. For Bedford, Tennessee, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.