Power by county

Perry, PA: data center power outlook

Perry, Pennsylvania is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Perry carries 10 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Perry spans 5 utilities, with ADAMS ELECTRIC COOPERATIVE INC, BOROUGH OF DUNCANNON - (PA), PENNSYLVANIA ELECTRIC CO among those mapped.

Grid position at a glance

Serving utilities
ADAMS ELECTRIC COOPERATIVE INC, BOROUGH OF DUNCANNON - (PA), PENNSYLVANIA ELECTRIC CO, PPL ELECTRIC UTILITIES CORP, VALLEY RURAL ELECTRIC COOP INC
ISO / market
PJM (PJM Interconnection)
Highest grid access
500 kV
Substations in county
10
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 5 serving utilities: 10.2 to 12.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
4.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
121,300 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Perry

What follows is a screening-grade read of Perry, Pennsylvania, built only from named public datasets. Grid access in Perry extends to 500 kV, a high-voltage line class. The mapped layer places 10 substations across Perry, a moderate density.

Interconnection over Perry runs through the PJM market (PJM Interconnection) and its rules. For Perry, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Perry that report an industrial rate span 2 of 5 serving utilities: 10.2 to 12.4¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Perry, Pennsylvania carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Perry, Pennsylvania has no EIA-860M generation on file, which reads as zero rather than as a gap. Perry sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Perry withdrew 4.83 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 121,300 people are employed in construction within a 120 km commute of Perry (BLS QCEW), which frames staffing distance rather than free labour.

For Perry, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Perry, Pennsylvania describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Perry, Pennsylvania, a specific address needs its own interconnection study, which this page does not attempt. The figures for Perry, Pennsylvania refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources