Power by county
Lehigh, PA: data center power outlook
Lehigh, Pennsylvania is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Lehigh carries 103 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Lehigh spans 2 utilities, with METROPOLITAN EDISON CO, PPL ELECTRIC UTILITIES CORP among those mapped.
Grid position at a glance
- Serving utilities
- METROPOLITAN EDISON CO, PPL ELECTRIC UTILITIES CORP
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 500 kV
- Substations in county
- 103
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- No per-utility rate on fileLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 48 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 262,532 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lehigh
The material below frames Lehigh, Pennsylvania for a prospective large load, drawing only on public sources. Grid access in Lehigh extends to 500 kV, a high-voltage line class. The mapped layer packs 103 substations into Lehigh, a dense spread of options.
Interconnection over Lehigh runs through the PJM market (PJM Interconnection) and its rules. For Lehigh, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one.
The covered queue feeds list nothing for Lehigh, Pennsylvania, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Lehigh, Pennsylvania, which is a national filing and so a real zero. Lehigh sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Lehigh withdrew 47.74 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 262,532 people are employed in construction within a 120 km commute of Lehigh (BLS QCEW), which frames staffing distance rather than free labour.
For Lehigh, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lehigh, Pennsylvania describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lehigh, Pennsylvania, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lehigh, Pennsylvania refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.