Power by county
Clearfield, PA: data center power outlook
Clearfield, Pennsylvania is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Clearfield carries 12 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Clearfield spans 4 utilities, with PENNSYLVANIA ELECTRIC CO, REA ENERGY COOP INC, UNITED ELECTRIC COOP, INC - (PA) among those mapped.
Grid position at a glance
- Serving utilities
- PENNSYLVANIA ELECTRIC CO, REA ENERGY COOP INC, UNITED ELECTRIC COOP, INC - (PA), WEST PENN POWER COMPANY
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 12
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 4 serving utilities: 11.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 4 projects, 1,227 MW
- Proposed generation
- 663 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 122 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 28,080 employed in construction within ~120 km (24 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Clearfield
The material below frames Clearfield, Pennsylvania for a prospective large load, drawing only on public sources. Grid access in Clearfield extends to 345 kV, a high-voltage line class. The mapped layer places 12 substations across Clearfield, a moderate density.
Interconnection over Clearfield runs through the PJM market (PJM Interconnection) and its rules. For Clearfield, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Clearfield that report an industrial rate span 1 of 4 serving utilities: 11.3¢/kWh, shown as context and never as the county rate.
The queue feeds show 4 projects for Clearfield, totalling 1,226.6 MW of requested capacity. EIA-860M records 662.6 MW planned or under construction for Clearfield. Clearfield sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Clearfield withdrew 121.98 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 28,080 people are employed in construction within a 120 km commute of Clearfield (BLS QCEW), which frames staffing distance rather than free labour.
For Clearfield, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Clearfield, Pennsylvania describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Clearfield, Pennsylvania, a specific address needs its own interconnection study, which this page does not attempt. The figures for Clearfield, Pennsylvania refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.