Power by county
Cameron, PA: data center power outlook
The grid around Cameron, Pennsylvania is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Cameron the mapped layer shows 1 mapped substation, with grid access reaching 230 kV at its strongest point. Retail service across Cameron is split among 3 utilities, among them PENNSYLVANIA ELECTRIC CO, TRI-COUNTY RURAL ELEC COOP INC (PA), WEST PENN POWER COMPANY.
Grid position at a glance
- Serving utilities
- PENNSYLVANIA ELECTRIC CO, TRI-COUNTY RURAL ELEC COOP INC (PA), WEST PENN POWER COMPANY
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 230 kV
- Substations in county
- 1
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 3 serving utilities: 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 0.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 20,073 employed in construction within ~120 km (22 of 23 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cameron
The sections below set out what public data shows about siting a large electrical load in Cameron, Pennsylvania. Transmission-class access reaches 230 kV in Cameron at its strongest mapped point. Across Cameron, Pennsylvania, the mapped layer holds just 1 substation, so options gather at a handful of places.
Wholesale activity over Cameron clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Cameron carries the state industrial average retail rate of 9.4 cents per kWh from EIA-861, applied statewide. For Cameron, the per-utility spread is 1 of 3 serving utilities: 9.3¢/kWh, which qualifies but never replaces the state average.
Cameron, Pennsylvania has nothing in the interconnection queue across the feeds covered here, quiet or uningested. For Cameron, Pennsylvania, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Cameron shows 716.09 lb CO2 per MWh.
For Cameron, the USGS 2015 compilation records 0.89 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Cameron sits within commuting range of roughly 20,073 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Cameron here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Cameron, Pennsylvania settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Cameron, Pennsylvania requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Cameron, Pennsylvania are logged directly below, so each figure on this page can be traced back to its public dataset.