The grid around Yamhill, Oregon is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Yamhill the mapped layer shows 21 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Yamhill is split among 6 utilities, among them BONNEVILLE POWER ADMINISTRATION, CITY OF MCMINNVILLE - (OR), PACIFICORP.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, CITY OF MCMINNVILLE - (OR), PACIFICORP, PORTLAND GENERAL ELECTRIC CO, TILLAMOOK PEOPLES UTILITY DIST, WEST OREGON ELECTRIC COOP INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 21
- Industrial retail rate
- 8.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 4.0 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 212 lb CO2/MWh
- Water withdrawals
- 133 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 105,985 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Yamhill
Read on for the public power picture of Yamhill in Oregon, assembled for data center siting. Transmission-class access reaches 230 kV in Yamhill at its strongest mapped point. Yamhill contains 21 mapped substations, a dense footprint that spreads interconnection options across many points.
No organized wholesale market covers Yamhill, Oregon, so capacity moves through the local utility and bilateral agreements. Yamhill carries the state industrial average retail rate of 8.3 cents per kWh from EIA-861, applied statewide. For Yamhill, the per-utility spread is 4 of 6 serving utilities: 4.0 to 9.7¢/kWh, which qualifies but never replaces the state average.
For Yamhill, Oregon, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Yamhill, Oregon in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Yamhill shows 212.458 lb CO2 per MWh.
For Yamhill, the USGS 2015 compilation records 132.5 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Yamhill sits within commuting range of roughly 105,985 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Yamhill here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Yamhill, Oregon settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Yamhill, Oregon requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Yamhill, Oregon are logged directly below, so each figure on this page can be traced back to its public dataset.