Power by county
Clatsop, OR: data center power outlook
Clatsop, Oregon is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Clatsop carries 17 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Clatsop spans 6 utilities, with BONNEVILLE POWER ADMINISTRATION, CLATSKANIE PEOPLES UTIL DIST, PACIFICORP among those mapped.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, CLATSKANIE PEOPLES UTIL DIST, PACIFICORP, PUD NO 1 OF WAHKIAKUM COUNTY, TILLAMOOK PEOPLES UTILITY DIST, WEST OREGON ELECTRIC COOP INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 17
- Industrial retail rate
- 8.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 5.8 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 212 lb CO2/MWh
- Water withdrawals
- 46 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 73,723 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Clatsop
What follows is a screening-grade read of Clatsop, Oregon, built only from named public datasets. At 230 kV, Clatsop sits in the transmission class that a large load would look to. The mapped layer places 17 substations across Clatsop, a moderate density.
Sitting outside any organized market, Clatsop, Oregon handles interconnection through its utility rather than a central operator. For Clatsop, the rate shown is the state industrial average of 8.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Clatsop that report an industrial rate span 3 of 6 serving utilities: 5.8 to 9.7¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Clatsop, Oregon, which may be quiet or simply uningested. Clatsop, Oregon has no EIA-860M generation on file, which reads as zero rather than as a gap. Clatsop sits under a balancing authority that eGRID puts at 212.458 lb CO2 per MWh.
Clatsop withdrew 45.66 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 73,723 people are employed in construction within a 120 km commute of Clatsop (BLS QCEW), which frames staffing distance rather than free labour.
For Clatsop, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Clatsop, Oregon describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Clatsop, Oregon, a specific address needs its own interconnection study, which this page does not attempt. The figures for Clatsop, Oregon refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.