Power by county

Seminole, OK: data center power outlook

The grid around Seminole, Oklahoma is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Seminole the mapped layer shows 30 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Seminole is split among 5 utilities, among them CANADIAN VALLEY ELEC COOP, INC, EAST CENTRAL OKLAHOMA ELEC COOP INC, OKLAHOMA GAS & ELECTRIC CO.

Grid position at a glance

Serving utilities
CANADIAN VALLEY ELEC COOP, INC, EAST CENTRAL OKLAHOMA ELEC COOP INC, OKLAHOMA GAS & ELECTRIC CO, PEOPLE'S ELECTRIC COOPERATIVE, PUBLIC SERVICE CO OF OKLAHOMA
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
30
Industrial retail rate
6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 5.5 to 6.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
5.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
63,439 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Seminole

The sections below set out what public data shows about siting a large electrical load in Seminole, Oklahoma. At 345 kV, Seminole carries high-voltage transmission at its strongest mapped point. Seminole contains 30 mapped substations, a dense footprint that spreads interconnection options across many points.

Wholesale activity over Seminole clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Seminole carries the state industrial average retail rate of 6.2 cents per kWh from EIA-861, applied statewide. For Seminole, the per-utility spread is 4 of 5 serving utilities: 5.5 to 6.3¢/kWh, which qualifies but never replaces the state average.

Seminole, Oklahoma has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Seminole, Oklahoma, a real zero rather than a gap. In eGRID, the balancing authority over Seminole shows 871.526 lb CO2 per MWh.

For Seminole, the USGS 2015 compilation records 5.15 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Seminole sits within commuting range of roughly 63,439 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Seminole here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Seminole, Oklahoma settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Seminole, Oklahoma requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Seminole, Oklahoma are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources