Rogers, OK: data center power outlook

For Rogers, Oklahoma, the public grid picture begins with its place in the SPP market (Southwest Power Pool) and the infrastructure mapped inside the county. Grid access across Rogers tops out at 345 kV, over a footprint of 37 mapped substations. In Rogers, 7 utilities share the retail territory, among them CITY OF CLAREMORE, CITY OF COLLINSVILLE - (OK), GRAND RIVER DAM AUTHORITY.

Grid position at a glance

Serving utilities
CITY OF CLAREMORE, CITY OF COLLINSVILLE - (OK), GRAND RIVER DAM AUTHORITY, LAKE REGION ELECTRIC COOP, INC - (OK), NORTHEAST OKLAHOMA ELECTRIC CO, PUBLIC SERVICE CO OF OKLAHOMA, VERDIGRIS VALLEY ELEC COOP INC
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
37
Industrial retail rate
6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
6 of 7 serving utilities: 4.9 to 10.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
85 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
34,362 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Rogers

This page gathers the public grid evidence for Rogers, Oklahoma that bears on a large new load. The highest mapped voltage in Rogers is 345 kV, in the high-voltage transmission class. Rogers carries 37 substations, a dense footprint across the county.

For Rogers, the SPP market (Southwest Power Pool) is the operator that handles interconnection and capacity. The state industrial average retail rate is 6.2 cents per kWh, drawn from EIA-861 and applied to Rogers at the state level rather than as a county rate. The serving utilities in Rogers that publish a rate range 6 of 7 serving utilities: 4.9 to 10.1¢/kWh, a spread kept separate from the state average.

For Rogers, Oklahoma, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Rogers, Oklahoma in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Rogers, via its balancing authority, is 871.526 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Rogers at 85.08 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Rogers, about 34,362 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Rogers figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Rogers, Oklahoma qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Rogers, Oklahoma turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Rogers, Oklahoma traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.