Power by county

Craig, OK: data center power outlook

Craig, Oklahoma is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Craig carries 13 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Craig spans 9 utilities, with 4 RIVERS ELECTRIC COOPERATIVE, INC., EVERGY KANSAS CENTRAL, INC, EVERGY KANSAS SOUTH, INC among those mapped.

Grid position at a glance

Serving utilities
4 RIVERS ELECTRIC COOPERATIVE, INC., EVERGY KANSAS CENTRAL, INC, EVERGY KANSAS SOUTH, INC, GRAND RIVER DAM AUTHORITY, HEARTLAND RURAL ELEC COOP, INC, NORTHEAST OKLAHOMA ELECTRIC CO, PUBLIC SERVICE CO OF OKLAHOMA, TWIN VALLEY ELECTRIC COOP INC, VERDIGRIS VALLEY ELEC COOP INC
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
13
Industrial retail rate
6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 9 serving utilities: 4.9 to 10.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
1.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
44,112 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Craig

The material below frames Craig, Oklahoma for a prospective large load, drawing only on public sources. Grid access in Craig extends to 345 kV, a high-voltage line class. The mapped layer places 13 substations across Craig, a moderate density.

Interconnection over Craig runs through the SPP market (Southwest Power Pool) and its rules. For Craig, the rate shown is the state industrial average of 6.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Craig that report an industrial rate span 4 of 9 serving utilities: 4.9 to 10.1¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Craig, Oklahoma in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Craig, Oklahoma has no EIA-860M generation on file, which reads as zero rather than as a gap. Craig sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Craig withdrew 1.6 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 44,112 people are employed in construction within a 120 km commute of Craig (BLS QCEW), which frames staffing distance rather than free labour.

For Craig, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Craig, Oklahoma describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Craig, Oklahoma, a specific address needs its own interconnection study, which this page does not attempt. The figures for Craig, Oklahoma refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources