Ross, OH: data center power outlook

Ross, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Ross carries 26 mapped substations within its boundary, and the highest reachable grid access is 765 kV. Service in Ross spans 5 utilities, with BUCKEYE RURAL ELEC COOP, INC, DAYTON POWER & LIGHT CO, OHIO POWER CO among those mapped.

Grid position at a glance

Serving utilities
BUCKEYE RURAL ELEC COOP, INC, DAYTON POWER & LIGHT CO, OHIO POWER CO, OHIO VALLEY ELECTRIC CORP, SOUTH CENTRAL POWER COMPANY
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
26
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 1.9 to 16.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
13 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
43 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
90,199 employed in construction within ~120 km (36 of 38 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Ross

The material below frames Ross, Ohio for a prospective large load, drawing only on public sources. Grid access in Ross extends to 765 kV, the extra-high-voltage class. The mapped layer packs 26 substations into Ross, a dense spread of options.

Interconnection over Ross runs through the PJM market (PJM Interconnection) and its rules. For Ross, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Ross that report an industrial rate span 5 serving utilities: 1.9 to 16.3¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Ross, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 12.5 MW planned or under construction for Ross. Ross sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Ross withdrew 43.24 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 90,199 people are employed in construction within a 120 km commute of Ross (BLS QCEW), which frames staffing distance rather than free labour.

For Ross, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Ross, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Ross, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Ross, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.