Power by county

Lorain, OH: data center power outlook

Lorain, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Lorain carries 78 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Lorain spans 9 utilities, with CITY OF AMHERST- (OH), CITY OF CLEVELAND - (OH), CITY OF OBERLIN - (OH) among those mapped.

Grid position at a glance

Serving utilities
CITY OF AMHERST- (OH), CITY OF CLEVELAND - (OH), CITY OF OBERLIN - (OH), CLEVELAND ELECTRIC ILLUM CO, FIRELANDS ELECTRIC COOP, INC, LORAIN-MEDINA R E C, INC, OHIO EDISON CO, VILLAGE OF GRAFTON - (OH), VILLAGE OF WELLINGTON - (OH)
ISO / market
PJM (PJM Interconnection)
Highest grid access
345 kV
Substations in county
78
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 9 serving utilities: 1.8 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
420 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
92,902 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lorain

The material below frames Lorain, Ohio for a prospective large load, drawing only on public sources. Grid access in Lorain extends to 345 kV, a high-voltage line class. The mapped layer packs 78 substations into Lorain, a dense spread of options.

Interconnection over Lorain runs through the PJM market (PJM Interconnection) and its rules. For Lorain, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Lorain that report an industrial rate span 4 of 9 serving utilities: 1.8 to 9.3¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Lorain, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Lorain, Ohio in EIA-860M as planned or under construction, which counts as a measured zero. Lorain sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Lorain withdrew 420.39 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 92,902 people are employed in construction within a 120 km commute of Lorain (BLS QCEW), which frames staffing distance rather than free labour.

For Lorain, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lorain, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lorain, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lorain, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.