Power by county
Holmes, OH: data center power outlook
Holmes, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Holmes carries 22 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Holmes spans 5 utilities, with FRONTIER POWER COMPANY, HOLMES-WAYNE ELECTRIC COOP INC, LICKING RURAL ELECTRIC INC among those mapped.
Grid position at a glance
- Serving utilities
- FRONTIER POWER COMPANY, HOLMES-WAYNE ELECTRIC COOP INC, LICKING RURAL ELECTRIC INC, OHIO EDISON CO, OHIO POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 138 kV
- Substations in county
- 22
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 1.8 to 13.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 6.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 137,584 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Holmes
What follows is a screening-grade read of Holmes, Ohio, built only from named public datasets. At 138 kV, Holmes sits in the transmission class that a large load would look to. The mapped layer packs 22 substations into Holmes, a dense spread of options.
Interconnection over Holmes runs through the PJM market (PJM Interconnection) and its rules. For Holmes, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Holmes that report an industrial rate span 4 of 5 serving utilities: 1.8 to 13.4¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Holmes, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Holmes, Ohio has no EIA-860M generation on file, which reads as zero rather than as a gap. Holmes sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Holmes withdrew 6.61 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 137,584 people are employed in construction within a 120 km commute of Holmes (BLS QCEW), which frames staffing distance rather than free labour.
For Holmes, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Holmes, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Holmes, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Holmes, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.