Hocking, OH: data center power outlook

Hocking sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Hocking, Ohio, drawn from public datasets. Counting from the mapped infrastructure, Hocking holds 7 mapped substations and reaches 765 kV. Hocking is covered by 2 retail service territories, including OHIO POWER CO, SOUTH CENTRAL POWER COMPANY.

Grid position at a glance

Serving utilities
OHIO POWER CO, SOUTH CENTRAL POWER COMPANY
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
7
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 serving utilities: 2.6 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
3.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
68,669 employed in construction within ~120 km (32 of 35 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Hocking

Everything here about Hocking, Ohio comes from public federal and state records, with the gaps left visible. Hocking reaches 765 kV, an extra-high-voltage class, at its strongest mapped point of grid access. With 7 substations mapped, Hocking has a moderate spread of interconnection points.

Hocking falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Hocking is the 8.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Hocking, reported per-utility industrial rates cover 2 serving utilities: 2.6 to 10.8¢/kWh, offered only as context beneath the state figure.

No interconnection-queue project is on record for Hocking, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Hocking, Ohio has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Hocking carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Hocking are 3.18 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Hocking, some 68,669 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Hocking are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Hocking, Ohio together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Hocking, Ohio is an address-level interconnection study; the county figures here only narrow where to look. For Hocking, Ohio, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.