Power by county
Highland, OH: data center power outlook
Highland, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Highland carries 10 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Highland spans 7 utilities, with ADAMS RURAL ELECTRIC COOP, INC, DAYTON POWER & LIGHT CO, DUKE ENERGY OHIO INC among those mapped.
Grid position at a glance
- Serving utilities
- ADAMS RURAL ELECTRIC COOP, INC, DAYTON POWER & LIGHT CO, DUKE ENERGY OHIO INC, OHIO POWER CO, OHIO VALLEY ELECTRIC CORP, SOUTH CENTRAL POWER COMPANY, VILLAGE OF BLANCHESTER - (OH)
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 10
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 1.8 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 200 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 2.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 118,331 employed in construction within ~120 km (37 of 45 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Highland
The material below frames Highland, Ohio for a prospective large load, drawing only on public sources. Grid access in Highland extends to 345 kV, a high-voltage line class. The mapped layer places 10 substations across Highland, a moderate density.
Interconnection over Highland runs through the PJM market (PJM Interconnection) and its rules. For Highland, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Highland that report an industrial rate span 5 of 7 serving utilities: 1.8 to 10.8¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Highland, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 200 MW planned or under construction for Highland. Highland sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Highland withdrew 2.76 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 118,331 people are employed in construction within a 120 km commute of Highland (BLS QCEW), which frames staffing distance rather than free labour.
For Highland, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Highland, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Highland, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Highland, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.