Power by county
Fulton, OH: data center power outlook
Fulton sits in the PJM market (PJM Interconnection); what follows is the screening-grade grid picture for Fulton, Ohio, drawn from public datasets. Counting from the mapped infrastructure, Fulton holds 13 mapped substations and reaches 345 kV. Fulton is covered by 5 retail service territories, including CONSUMERS ENERGY CO, MIDWEST ENERGY COOPERATIVE, THE TOLEDO EDISON CO.
Grid position at a glance
- Serving utilities
- CONSUMERS ENERGY CO, MIDWEST ENERGY COOPERATIVE, THE TOLEDO EDISON CO, TRICOUNTY RURAL ELEC COOP, INC, VILLAGE OF CLINTON - (MI)
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 13
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- No per-utility rate on fileLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 199 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 4.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 89,677 employed in construction within ~120 km (31 of 32 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Fulton
Below, Fulton in Ohio is described from public data as a starting point for siting diligence. Fulton reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 13 substations mapped, Fulton has a moderate spread of interconnection points.
Fulton falls inside the PJM market (PJM Interconnection), which governs how its interconnection requests and capacity move. The rate for Fulton is the 8.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by.
The covered queue feeds list nothing for Fulton, Ohio, which may be quiet or simply uningested. Fulton has 199 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Fulton carries a grid carbon intensity of 716.09 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Fulton are 4.36 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Fulton, some 89,677 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Fulton are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Fulton, Ohio together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Fulton, Ohio is an address-level interconnection study; the county figures here only narrow where to look. For Fulton, Ohio, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.