Clermont, OH: data center power outlook
The grid around Clermont, Ohio is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Clermont the mapped layer shows 46 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Clermont is split among 8 utilities, among them BLUE GRASS ENERGY COOP CORP, DUKE ENERGY KENTUCKY, DUKE ENERGY OHIO INC.
Grid position at a glance
- Serving utilities
- BLUE GRASS ENERGY COOP CORP, DUKE ENERGY KENTUCKY, DUKE ENERGY OHIO INC, EAST KENTUCKY POWER COOP, INC, KENTUCKY UTILITIES CO, SOUTH CENTRAL POWER COMPANY, VILLAGE OF BETHEL - (OH), VILLAGE OF BLANCHESTER - (OH)
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 46
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 8 serving utilities: 1.8 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 48 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 90,768 employed in construction within ~120 km (45 of 55 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Clermont
Read on for the public power picture of Clermont in Ohio, assembled for data center siting. At 345 kV, Clermont carries high-voltage transmission at its strongest mapped point. Clermont contains 46 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Clermont clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Clermont carries the state industrial average retail rate of 8.5 cents per kWh from EIA-861, applied statewide. For Clermont, the per-utility spread is 2 of 8 serving utilities: 1.8 to 10.8¢/kWh, which qualifies but never replaces the state average.
Clermont, Ohio shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Clermont, Ohio in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Clermont shows 716.09 lb CO2 per MWh.
For Clermont, the USGS 2015 compilation records 48.15 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Clermont sits within commuting range of roughly 90,768 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Clermont here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Clermont, Ohio settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Clermont, Ohio requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Clermont, Ohio are logged directly below, so each figure on this page can be traced back to its public dataset.