Power by county
Slope, ND: data center power outlook
Slope, North Dakota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Slope carries 5 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Slope spans 7 utilities, with BASIN ELECTRIC POWER COOP, GOLDENWEST ELECTRIC COOP, INC, MONTANA-DAKOTA UTILITIES CO among those mapped.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, GOLDENWEST ELECTRIC COOP, INC, MONTANA-DAKOTA UTILITIES CO, ROUGHRIDER ELECTRIC COOPERATIV, SLOPE ELECTRIC COOP INC, SOUTHEAST ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 230 kV
- Substations in county
- 5
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 1.1 to 8.5¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 0.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,395 employed in construction within ~120 km (5 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Slope
What follows is a screening-grade read of Slope, North Dakota, built only from named public datasets. At 230 kV, Slope sits in the transmission class that a large load would look to. The mapped footprint in Slope, North Dakota is sparse, 5 substations, so options cluster at those points.
Interconnection over Slope runs through the SPP market (Southwest Power Pool) and its rules. For Slope, the rate shown is the state industrial average of 7.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Slope that report an industrial rate span 5 of 7 serving utilities: 1.1 to 8.5¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Slope, North Dakota in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Slope, North Dakota in EIA-860M as planned or under construction, which counts as a measured zero. Slope sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Slope withdrew 0.79 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 2,395 people are employed in construction within a 120 km commute of Slope (BLS QCEW), which frames staffing distance rather than free labour.
For Slope, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Slope, North Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Slope, North Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Slope, North Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.