Sheridan, ND: data center power outlook
Sheridan, North Dakota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Sheridan carries 7 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Sheridan spans 10 utilities, with BASIN ELECTRIC POWER COOP, CAPITAL ELECTRIC COOP, INC, MCLEAN ELECTRIC COOP, INC among those mapped.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, CAPITAL ELECTRIC COOP, INC, MCLEAN ELECTRIC COOP, INC, MONTANA-DAKOTA UTILITIES CO, MOUNTRAIL-WILLIAMS ELEC COOP, NORTHERN PLAINS ELECTRIC COOP, NORTHERN STATES POWER CO - MINNESOTA, OTTER TAIL POWER CO, VERENDRYE ELECTRIC COOP INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 7
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 10 serving utilities: 1.1 to 12.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 600 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 0.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,763 employed in construction within ~120 km (11 of 12 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Sheridan
The material below frames Sheridan, North Dakota for a prospective large load, drawing only on public sources. Grid access in Sheridan extends to 345 kV, a high-voltage line class. The mapped layer places 7 substations across Sheridan, a moderate density.
Interconnection over Sheridan runs through the SPP market (Southwest Power Pool) and its rules. For Sheridan, the rate shown is the state industrial average of 7.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Sheridan that report an industrial rate span 10 serving utilities: 1.1 to 12.8¢/kWh, shown as context and never as the county rate.
The queue feeds show 3 projects for Sheridan, totalling 600 MW of requested capacity. Nothing is on file for Sheridan, North Dakota in EIA-860M as planned or under construction, which counts as a measured zero. Sheridan sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Sheridan withdrew 0.37 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,763 people are employed in construction within a 120 km commute of Sheridan (BLS QCEW), which frames staffing distance rather than free labour.
For Sheridan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Sheridan, North Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Sheridan, North Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Sheridan, North Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.