Rolette, ND: data center power outlook
The grid around Rolette, North Dakota is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Rolette the mapped layer shows 19 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Rolette is split among 6 utilities, among them BASIN ELECTRIC POWER COOP, MONTANA-DAKOTA UTILITIES CO, NORTH CENTRAL ELEC COOP, INC.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, MONTANA-DAKOTA UTILITIES CO, NORTH CENTRAL ELEC COOP, INC, NORTHERN PLAINS ELECTRIC COOP, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 230 kV
- Substations in county
- 19
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 serving utilities: 1.1 to 8.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 150 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 2.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 880 employed in construction within ~120 km (7 of 8 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Rolette
Read on for the public power picture of Rolette in North Dakota, assembled for data center siting. Transmission-class access reaches 230 kV in Rolette at its strongest mapped point. Rolette contains 19 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Rolette clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Rolette carries the state industrial average retail rate of 7.5 cents per kWh from EIA-861, applied statewide. For Rolette, the per-utility spread is 6 serving utilities: 1.1 to 8.4¢/kWh, which qualifies but never replaces the state average.
Rolette carries 1 project in the interconnection queue, totalling 150 MW of requested capacity. For Rolette, North Dakota, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Rolette shows 871.526 lb CO2 per MWh.
For Rolette, the USGS 2015 compilation records 2.45 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Rolette sits within commuting range of roughly 880 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Rolette here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Rolette, North Dakota settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Rolette, North Dakota requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Rolette, North Dakota are logged directly below, so each figure on this page can be traced back to its public dataset.