Power by county
Logan, ND: data center power outlook
Logan, North Dakota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Logan carries 12 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Logan spans 6 utilities, with BASIN ELECTRIC POWER COOP, DAKOTA VALLEY ELEC COOP INC, KEM ELECTRIC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, DAKOTA VALLEY ELEC COOP INC, KEM ELECTRIC COOP INC, MONTANA-DAKOTA UTILITIES CO, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 12
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 1.1 to 7.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 1 projects, 145 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,683 employed in construction within ~120 km (10 of 12 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Logan
The material below frames Logan, North Dakota for a prospective large load, drawing only on public sources. Grid access in Logan extends to 345 kV, a high-voltage line class. The mapped layer places 12 substations across Logan, a moderate density.
Interconnection over Logan runs through the SPP market (Southwest Power Pool) and its rules. For Logan, the rate shown is the state industrial average of 7.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Logan that report an industrial rate span 5 of 6 serving utilities: 1.1 to 7.8¢/kWh, shown as context and never as the county rate.
The queue feeds show 1 project for Logan, totalling 145 MW of requested capacity. Nothing is on file for Logan, North Dakota in EIA-860M as planned or under construction, which counts as a measured zero. Logan sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Logan withdrew 2.32 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,683 people are employed in construction within a 120 km commute of Logan (BLS QCEW), which frames staffing distance rather than free labour.
For Logan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Logan, North Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Logan, North Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Logan, North Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.