Kidder, ND: data center power outlook
Kidder, North Dakota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Kidder carries 14 mapped substations within its boundary, and the highest reachable grid access is 400 kV. Service in Kidder spans 8 utilities, with BASIN ELECTRIC POWER COOP, CAPITAL ELECTRIC COOP, INC, DAKOTA VALLEY ELEC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, CAPITAL ELECTRIC COOP, INC, DAKOTA VALLEY ELEC COOP INC, KEM ELECTRIC COOP INC, MONTANA-DAKOTA UTILITIES CO, NORTHERN PLAINS ELECTRIC COOP, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 400 kV
- Substations in county
- 14
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 7 of 8 serving utilities: 1.1 to 12.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 17 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 5,806 employed in construction within ~120 km (11 of 13 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Kidder
What follows is a screening-grade read of Kidder, North Dakota, built only from named public datasets. Grid access in Kidder extends to 400 kV, a high-voltage line class. The mapped layer places 14 substations across Kidder, a moderate density.
Interconnection over Kidder runs through the SPP market (Southwest Power Pool) and its rules. For Kidder, the rate shown is the state industrial average of 7.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Kidder that report an industrial rate span 7 of 8 serving utilities: 1.1 to 12.8¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Kidder, North Dakota in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Kidder, North Dakota, which is a national filing and so a real zero. Kidder sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Kidder withdrew 16.6 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 5,806 people are employed in construction within a 120 km commute of Kidder (BLS QCEW), which frames staffing distance rather than free labour.
For Kidder, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Kidder, North Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Kidder, North Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Kidder, North Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.