Power by county
Eddy, ND: data center power outlook
Eddy sits in the SPP market (Southwest Power Pool); what follows is the screening-grade grid picture for Eddy, North Dakota, drawn from public datasets. Counting from the mapped infrastructure, Eddy holds 13 mapped substations and reaches 345 kV. Eddy is covered by 5 retail service territories, including BASIN ELECTRIC POWER COOP, NODAK ELECTRIC COOP INC, NORTHERN PLAINS ELECTRIC COOP.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, NODAK ELECTRIC COOP INC, NORTHERN PLAINS ELECTRIC COOP, OTTER TAIL POWER CO, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 13
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 1.1 to 8.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 2.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,712 employed in construction within ~120 km (13 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Eddy
Everything here about Eddy, North Dakota comes from public federal and state records, with the gaps left visible. Eddy reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 13 substations mapped, Eddy has a moderate spread of interconnection points.
Eddy falls inside the SPP market (Southwest Power Pool), which governs how its interconnection requests and capacity move. The rate for Eddy is the 7.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Eddy, reported per-utility industrial rates cover 5 serving utilities: 1.1 to 8.4¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Eddy, North Dakota, which may be quiet or simply uningested. Eddy, North Dakota has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Eddy carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Eddy are 2.05 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Eddy, some 4,712 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Eddy are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Eddy, North Dakota together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Eddy, North Dakota is an address-level interconnection study; the county figures here only narrow where to look. For Eddy, North Dakota, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.