Bowman, ND: data center power outlook
For Bowman, North Dakota, the public grid picture begins with its place in the SPP market (Southwest Power Pool) and the infrastructure mapped inside the county. Grid access across Bowman tops out at 230 kV, over a footprint of 31 mapped substations. In Bowman, 6 utilities share the retail territory, among them BASIN ELECTRIC POWER COOP, GRAND ELECTRIC COOP, INC, MONTANA-DAKOTA UTILITIES CO.
Grid position at a glance
- Serving utilities
- BASIN ELECTRIC POWER COOP, GRAND ELECTRIC COOP, INC, MONTANA-DAKOTA UTILITIES CO, SLOPE ELECTRIC COOP INC, SOUTHEAST ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 230 kV
- Substations in county
- 31
- Industrial retail rate
- 7.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 1.1 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 1.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 2,452 employed in construction within ~120 km (6 of 11 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bowman
This page gathers the public grid evidence for Bowman, North Dakota that bears on a large new load. The strongest mapped access in Bowman is 230 kV, squarely transmission class. Bowman carries 31 substations, a dense footprint across the county.
For Bowman, the SPP market (Southwest Power Pool) is the operator that handles interconnection and capacity. The state industrial average retail rate is 7.5 cents per kWh, drawn from EIA-861 and applied to Bowman at the state level rather than as a county rate. The serving utilities in Bowman that publish a rate range 4 of 6 serving utilities: 1.1 to 7.6¢/kWh, a spread kept separate from the state average.
Bowman, North Dakota has nothing in the interconnection queue across the feeds covered here, quiet or uningested. No generation is filed as planned or under construction in Bowman, North Dakota in the federal EIA-860M inventory, a measured zero rather than missing data. Grid carbon intensity for Bowman, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Bowman at 1.27 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Bowman, about 2,452 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Bowman figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Bowman, North Dakota qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Bowman, North Dakota turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Bowman, North Dakota traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.