Pasquotank, NC: data center power outlook
The grid around Pasquotank, North Carolina is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Pasquotank the mapped layer shows 13 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Pasquotank is split among 3 utilities, among them ALBEMARLE ELECTRIC MEMBER CORP, CITY OF ELIZABETH CITY - (NC), VIRGINIA ELECTRIC & POWER CO.
Grid position at a glance
- Serving utilities
- ALBEMARLE ELECTRIC MEMBER CORP, CITY OF ELIZABETH CITY - (NC), VIRGINIA ELECTRIC & POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 230 kV
- Substations in county
- 13
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 8.1 to 9.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 12 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 3.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 44,213 employed in construction within ~120 km (31 of 33 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Pasquotank
The sections below set out what public data shows about siting a large electrical load in Pasquotank, North Carolina. Transmission-class access reaches 230 kV in Pasquotank at its strongest mapped point. Pasquotank contains 13 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Pasquotank clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Pasquotank carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Pasquotank, the per-utility spread is 2 of 3 serving utilities: 8.1 to 9.0¢/kWh, which qualifies but never replaces the state average.
For Pasquotank, North Carolina, no queued project appears in the feeds currently covered. In Pasquotank, 12.3 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Pasquotank shows 716.09 lb CO2 per MWh.
For Pasquotank, the USGS 2015 compilation records 3.59 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Pasquotank sits within commuting range of roughly 44,213 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Pasquotank here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Pasquotank, North Carolina settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Pasquotank, North Carolina requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Pasquotank, North Carolina are logged directly below, so each figure on this page can be traced back to its public dataset.