Power by county

Davie, NC: data center power outlook

Davie, North Carolina is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Davie carries 17 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Davie spans 3 utilities, with DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP, SURRY-YADKIN ELEC MEMBER CORP among those mapped.

Grid position at a glance

Serving utilities
DUKE ENERGY CAROLINAS, LLC, ENERGYUNITED ELEC MEMBER CORP, SURRY-YADKIN ELEC MEMBER CORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
17
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 5.8 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
60 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
485 lb CO2/MWh
Water withdrawals
5.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
135,185 employed in construction within ~120 km (37 of 39 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Davie

What follows is a screening-grade read of Davie, North Carolina, built only from named public datasets. At 230 kV, Davie sits in the transmission class that a large load would look to. The mapped layer places 17 substations across Davie, a moderate density.

Because Davie, North Carolina sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Davie, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Davie that report an industrial rate span 3 serving utilities: 5.8 to 14.1¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Davie, North Carolina, which may be quiet or simply uningested. EIA-860M records 60 MW planned or under construction for Davie. Davie sits under a balancing authority that eGRID puts at 484.617 lb CO2 per MWh.

Davie withdrew 5.69 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 135,185 people are employed in construction within a 120 km commute of Davie (BLS QCEW), which frames staffing distance rather than free labour.

For Davie, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Davie, North Carolina describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Davie, North Carolina, a specific address needs its own interconnection study, which this page does not attempt. The figures for Davie, North Carolina refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources