Dare, NC: data center power outlook

Dare, North Carolina is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Dare carries 18 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Dare spans 3 utilities, with CAPE HATTERAS ELEC MEMBER CORP, TIDELAND ELECTRIC MEMBER CORP, VIRGINIA ELECTRIC & POWER CO among those mapped.

Grid position at a glance

Serving utilities
CAPE HATTERAS ELEC MEMBER CORP, TIDELAND ELECTRIC MEMBER CORP, VIRGINIA ELECTRIC & POWER CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
230 kV
Substations in county
18
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 8.1 to 8.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
482 lb CO2/MWh
Water withdrawals
8.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
25,525 employed in construction within ~120 km (15 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Dare

The material below frames Dare, North Carolina for a prospective large load, drawing only on public sources. At 230 kV, Dare sits in the transmission class that a large load would look to. The mapped layer places 18 substations across Dare, a moderate density.

Interconnection over Dare runs through the PJM market (PJM Interconnection) and its rules. For Dare, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Dare that report an industrial rate span 2 of 3 serving utilities: 8.1 to 8.9¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Dare, North Carolina, which may be quiet or simply uningested. Nothing is on file for Dare, North Carolina in EIA-860M as planned or under construction, which counts as a measured zero. Dare sits under a balancing authority that eGRID puts at 481.506 lb CO2 per MWh.

Dare withdrew 8.35 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 25,525 people are employed in construction within a 120 km commute of Dare (BLS QCEW), which frames staffing distance rather than free labour.

For Dare, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Dare, North Carolina describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Dare, North Carolina, a specific address needs its own interconnection study, which this page does not attempt. The figures for Dare, North Carolina refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.