Power by county
Cumberland, NC: data center power outlook
Cumberland, North Carolina is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Cumberland carries 174 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Cumberland spans 5 utilities, with CENTRAL ELECTRIC MEMBERSHIP CORP. - (NC), DUKE ENERGY PROGRESS - (NC), FAYETTEVILLE PUBLIC WORKS COMMISSION among those mapped.
Grid position at a glance
- Serving utilities
- CENTRAL ELECTRIC MEMBERSHIP CORP. - (NC), DUKE ENERGY PROGRESS - (NC), FAYETTEVILLE PUBLIC WORKS COMMISSION, LUMBEE RIVER ELEC MEMBER CORP, SOUTH RIVER ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 174
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 6.9 to 8.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 482 lb CO2/MWh
- Water withdrawals
- 45 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 94,178 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cumberland
What follows is a screening-grade read of Cumberland, North Carolina, built only from named public datasets. Grid access in Cumberland extends to 500 kV, a high-voltage line class. The mapped layer packs 174 substations into Cumberland, a dense spread of options.
Cumberland, North Carolina is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Cumberland, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Cumberland that report an industrial rate span 5 serving utilities: 6.9 to 8.6¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Cumberland, North Carolina, which may be quiet or simply uningested. Nothing is on file for Cumberland, North Carolina in EIA-860M as planned or under construction, which counts as a measured zero. Cumberland sits under a balancing authority that eGRID puts at 481.506 lb CO2 per MWh.
Cumberland withdrew 45.09 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 94,178 people are employed in construction within a 120 km commute of Cumberland (BLS QCEW), which frames staffing distance rather than free labour.
For Cumberland, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Cumberland, North Carolina describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Cumberland, North Carolina, a specific address needs its own interconnection study, which this page does not attempt. The figures for Cumberland, North Carolina refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.