Power by county

Warren, NY: data center power outlook

Warren, New York is served through the NYISO market (New York Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Warren carries 40 mapped substations within its boundary, and the highest reachable grid access is 115 kV. The serving utility mapped across Warren is NIAGARA MOHAWK POWER CORP..

Grid position at a glance

Serving utilities
NIAGARA MOHAWK POWER CORP.
ISO / market
NYISO (New York Independent System Operator)
Highest grid access
115 kV
Substations in county
40
Industrial retail rate
9.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 2.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
479 lb CO2/MWh
Water withdrawals
39 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
32,732 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Warren

What follows is a screening-grade read of Warren, New York, built only from named public datasets. At 115 kV, Warren sits in the transmission class that a large load would look to. The mapped layer packs 40 substations into Warren, a dense spread of options.

Interconnection over Warren runs through the NYISO market (New York Independent System Operator) and its rules. For Warren, the rate shown is the state industrial average of 9.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Warren that report an industrial rate span 1 serving utility: 2.7¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Warren, New York in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Warren, New York, which is a national filing and so a real zero. Warren sits under a balancing authority that eGRID puts at 479.212 lb CO2 per MWh.

Warren withdrew 39.03 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 32,732 people are employed in construction within a 120 km commute of Warren (BLS QCEW), which frames staffing distance rather than free labour.

For Warren, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Warren, New York describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Warren, New York, a specific address needs its own interconnection study, which this page does not attempt. The figures for Warren, New York refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.